TRU Interlock Plus

✓ Service Bilingue

Call us

Office hours

08:00 am - 06:00 pm

✓ Service Bilingue

Call us

✓ Service Bilingue

Call us

Office hours

08:00 am - 06:00 pm

contact us
Warehouse Location

We usually respond within 24 hours. 

interlock companies ottawa - TRU Interlock Repair

1789 Old Montreal Road Cumberland, ON K4C 1G7

The Interlock Season is Almost Here!

Book your project early and beat the crowd!

Days
Hours
Minutes
Seconds
Get your TRU® Estimate

Have a project in mind? Reach out today to book your free estimate.

Call Us

(613) 986-2451

Book now

Download Brochure
Please download our document to see specific data of the aservice and how we work.
Culvert repair in Ottawa reinforcing drainage and preventing erosion.

Culvert Interlock Installation in Ottawa

Ensure proper water drainage and long-term durability with expert culvert interlock installation in Ottawa. TRU Interlock Plus specializes in reinforcing and stabilizing culverts using high-quality interlock materials, preventing erosion, washouts, and structural failure. Whether you need a new culvert installation or an upgrade to an existing structure, our interlock solutions provide strength, stability, and a seamless finish that blends with your landscape.

Our 4-Step Process

01.

Site Evaluation & Drainage Assessment

We assess the site’s drainage needs, soil stability, and culvert positioning to design the best installation solution.

02.

Excavation & Base Preparation

We clear debris, excavate the area, and install a reinforced base to prevent future shifting and erosion.

03.
Interlock Installation & Culvert Reinforcement

We use high-quality interlock pavers to create a durable, weather-resistant structure around the culvert, ensuring proper water flow and stability.

04.
Finishing Touches & Quality Inspection

Final adjustments are made to enhance durability, secure interlock pavers, and ensure a long-lasting, polished appearance.

See the TRU® Transformation

Why Culvert Interlock Installation is Important

Prevents Erosion & Washouts: Reinforces culvert edges to protect surrounding soil and prevent structural failure.


Ensures Proper Drainage: Directs water flow efficiently, reducing flooding and water damage.


Adds Durability & Longevity: Interlock materials withstand heavy traffic, freeze-thaw cycles, and Ottawa’s harsh weather.


Improves Aesthetics: A professionally installed culvert creates a seamless, polished look that blends with driveways and landscapes.


Low Maintenance & Cost-Effective: Unlike traditional culvert reinforcements, interlock provides a long-term solution with minimal upkeep.

GET YOUR TRU® QUOTE

Frequently asked questions

The cost of culvert interlock installation in Ottawa varies based on the size of the culvert, materials used, and drainage complexity. A free consultation will provide an accurate estimate tailored to your project.

Contact us today for a free TRU® quote and discover how affordable our services can be!

Most culvert interlock installations take between 2 to 5 days, depending on site conditions and project scope.

Interlock is strong, weather-resistant, and allows for flexibility, making it more durable than concrete while providing an aesthetic and functional solution.

Minimal maintenance is required! Regularly clearing debris and inspecting drainage flow ensures the culvert functions properly for years to come.

Featured projects

The Interlock Season is Almost Here!​

Book your project early and beat the crowd!

Days
Hours
Minutes
Seconds